人人操人人干人人碰免费视频江苏丹徒蒙银村镇银行被罚40万:违规办理票据贴现

發布時間︰

  “可能是茶葉好的緣故,這是平叟的二兒子送到莊子里來的。”雲瑯連忙回答。   年長的胥吏被雲瑯一句話給噎的說不出話來。人人操   不想看那群烏泱泱跑出來的婆娘,一群男人一個女人的時候,那個女人會非常的小心,如果是一個男子,一群女子,那群女子就會變成主動調戲男子的流氓。人人干   “認識!” 第四十七章 警告人人碰免费视频   紅袖人小,跑的慢,等她跑過來的時候,小蟲已經張大了嘴巴笑嘻嘻的對紅袖道︰“紅袖,你看啊,這是小郎給我的銀錠子,這一次你可沒有!”
Previous Next

project at a glance

The Buerger Center for Advanced Pediatric Care at the Children's Hospital of Philadelphia is a 12-story, 700,000 square foot ambulatory care center with an adjacent, five-story, 1500-space underground parking garage, and an expanded central utility plant. The Center houses various ambulatory care clinics supporting outpatient diagnostics and specialty care services.  It is located beside the Colket Translational Research Building, which was also built by Turner.

Turner performed one of the largest excavations of its kind in the city of Philadelphia in order to prepare this site for the facility. Over the course of the nine-month excavation, the team excavated 70 feet down and hauled out roughly 300,000 cubic yards of rock.

In addition to building a world-class pediatric care facility, the project involved the construction of the largest green roof in Philadelphia, a sprawling 3-acre landscaped plaza.  Constructed on the roof level of the parking garage, the plaza incorporates local trees, shrubs, and flowering plants as well as four separate water fountains to create a setting that rivals a botanical garden.  The plaza alone took nearly 145,000 man-hours to complete and includes 166 trees, 3,635 shrubs, 16,366 perennials, 6,000 cubic yards of planting soil and stone mix, 30,000 square feet of stone pavers, and 10,000 square feet of stone cladding.

The project  achieved LEED Gold certification.

View this project in Turner City 2015.

Make a 3D print of the Buerger Center for Advanced Pediatric Care.

For Services / Specializations
and Additional Key Contacts
See Office Network

*Office includes a Special
Projects Division or Interiors
Group