人人碰免费视频人人摸人人碰在线视频做好最后准备:三大运营商将开启5G网络商用

發布時間︰

  看的出來她非常的害怕。   雲瑯笑道︰“等這里清理完畢了,我們就回軍,去長門宮!”人人碰免费视频   知道了前因後果的司馬遷猶豫良久,終于在東方朔的勸說下修改了記錄。人人摸   雲瑯笑了。   “內應!”雲瑯冷冷的道。人人碰在线视频   王溫舒見雲瑯不像是在開玩笑,就準備起身,然而,他努力了幾次之後發現,自己竟然無法站起來,雲瑯頂在他眉頭的手指並未用多少力氣,他一個可以跟匈奴人面對面廝殺的強者,竟然無法啊站起來。
Previous Next

project at a glance

The Buerger Center for Advanced Pediatric Care at the Children's Hospital of Philadelphia is a 12-story, 700,000 square foot ambulatory care center with an adjacent, five-story, 1500-space underground parking garage, and an expanded central utility plant. The Center houses various ambulatory care clinics supporting outpatient diagnostics and specialty care services.  It is located beside the Colket Translational Research Building, which was also built by Turner.

Turner performed one of the largest excavations of its kind in the city of Philadelphia in order to prepare this site for the facility. Over the course of the nine-month excavation, the team excavated 70 feet down and hauled out roughly 300,000 cubic yards of rock.

In addition to building a world-class pediatric care facility, the project involved the construction of the largest green roof in Philadelphia, a sprawling 3-acre landscaped plaza.  Constructed on the roof level of the parking garage, the plaza incorporates local trees, shrubs, and flowering plants as well as four separate water fountains to create a setting that rivals a botanical garden.  The plaza alone took nearly 145,000 man-hours to complete and includes 166 trees, 3,635 shrubs, 16,366 perennials, 6,000 cubic yards of planting soil and stone mix, 30,000 square feet of stone pavers, and 10,000 square feet of stone cladding.

The project  achieved LEED Gold certification.

View this project in Turner City 2015.

Make a 3D print of the Buerger Center for Advanced Pediatric Care.

For Services / Specializations
and Additional Key Contacts
See Office Network

*Office includes a Special
Projects Division or Interiors
Group